Powered By Kitlog Pro v2.0
Flandy Rv-10
RV-10
Empennage
10-15-2008
< Previous Log Entry
Next Log Entry >
Date:
10-15-2008
Number of Hours:
2.00
Manual Reference:
11-4 to 11-5
Brief Description:
HS to tail cone attachment
11-4
Step 1 Final drilled VS-1016 VS attach hole to 1/4" and match drilled to HS #12.
Step 2 Fabricated F-1098shims per plans.
Step 3 Attached shims to VS
Step 4 Installed HS on tailcone and matched drilled VS aft spar to F-1011C attachment bars #12.
Installed hardware per plans.
11-5
Step 1 Cut wood block to fit between fron attach points and clamped in place.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
1174
3570
Avionics
105
330
Empennage
143
284
Engine
205
918
Fuselage
475
1411
Miscellaneous
11
48
Wings
235
579
Copyright © 2001-2024 Matronics. All Rights Reserved.