Steps 1-4 Installed rod endbearings and jam nuts to elevators. Set at 7/8" depth. Installed on HS that is screwed to bench. Checked for freedom of movement and deflection of 30 degrees up and 25 degrees down. Checked counterbalance tip clearance at 1/8". Temp. installed right elevator to check for symetrical installation.