Powered By Kitlog Pro v2.0
Flandy Rv-10
RV-10
Engine
11-10-2016
< Previous Log Entry
Next Log Entry >
Date:
11-10-2016
Number of Hours:
6.50
Manual Reference:
Brief Description:
Cooling Ducts Day #31 and Cowling Day #76
Insulated oil cooler ducting with two layers of 1/16" FiberFrax. Installed cooler temporarily.
Fabricated intercooler inlet gap seal and reatining ring. Installed cowling to test. Removed and trimmed both ducts.
Bonded intercooler inlet onto cowling. Added additional layers to one side of oil cooler inlet to adjust fit.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
1174
3570
Avionics
105
330
Empennage
143
284
Engine
205
918
Fuselage
475
1411
Miscellaneous
11
48
Wings
235
579
Copyright © 2001-2024 Matronics. All Rights Reserved.