Powered By Kitlog Pro v2.0
Flandy Rv-10
RV-10
Engine
11-9-2016
< Previous Log Entry
Next Log Entry >
Date:
11-9-2016
Number of Hours:
4.50
Manual Reference:
Brief Description:
Cooling Ducts Day #30
Finished trimming oil cooler duct. Drilled and installed nutplates to both duct and oil cooler.
Had to remove #4 cylinder baffle to access part of cooler. Reinstalled and resealed.
Sanded and painted inside and outside of cooling duct.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
1174
3570
Avionics
105
330
Empennage
143
284
Engine
205
918
Fuselage
475
1411
Miscellaneous
11
48
Wings
235
579
Copyright © 2001-2024 Matronics. All Rights Reserved.