Powered By Kitlog Pro v2.0
Flandy Rv-10
RV-10
Engine
2-12-2016
< Previous Log Entry
Next Log Entry >
Date:
2-12-2016
Number of Hours:
3.00
Manual Reference:
Brief Description:
Intercooler Mount and oil lines
Completed fabrication on lower intercooler two part mount.
Installed prop accumulator oil line and oil pressure line to sensor block.
Installed MAP line to sensor block- may need to have this shortened later.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
1174
3570
Avionics
105
330
Empennage
143
284
Engine
205
918
Fuselage
475
1411
Miscellaneous
11
48
Wings
235
579
Copyright © 2001-2024 Matronics. All Rights Reserved.