Powered By Kitlog Pro v2.0
Flandy Rv-10
RV-10
Engine
2-11-2016
< Previous Log Entry
Next Log Entry >
Date:
2-11-2016
Number of Hours:
5.00
Manual Reference:
Brief Description:
Cooler work continues
Oil cooler---worked out potential oil line routing and ca bin heat exchanger location. Verified prop cable will fit between cooler and engine.
Intercooler-- refabricated upper mounts out of 1/8" thick aluminum stock to increase rigidity. Started fabricating lower attach bracket.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
1174
3570
Avionics
105
330
Empennage
143
284
Engine
205
918
Fuselage
475
1411
Miscellaneous
11
48
Wings
235
579
Copyright © 2001-2024 Matronics. All Rights Reserved.