KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  12-13-2013
Number of Hours:  3.00
Manual Reference:  37
Brief Description:  Fuel system #9 and Tank work

Worked on ext. valve installation. Trimmed the ext rod to the correct length. During testing the installation, the valve detents did not line up with the faceplate stops. Double checked all parts where assembled per directions and Andair website photos One of the two parts in photo is not correct.

Found my alternative vent system has interference issue with the fuselage wing spar connection and I need to install low fuel optical sensor.

Cut 5" hole in right tank aft bulkhead-UGH!!! Removed AN832-5-D fitting and determined that a 90 degre bulkhead fitting will provide adequate clearance with spar carry through structure.
' style=

One of these is the wrong part.

One of these is the wrong part.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.