KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  12-12-2013
Number of Hours:  3.00
Manual Reference:  37
Brief Description:  Fuel system day #8 and servo install

Completed rough installation of A/P roll servo in right wing.

USPS finally delivered the remaining part for my fuel system. Installed right feed line to fuel valve. Clocked and tightened all hoses on fuel valve and then inserted unit in tunnel. Loosely connected all tunnel hose connections and then tightened mount bolts for fuel valve and fuel pump. Then tightened remaining hose connections. Tightened nuts at tunnel transition and installed left filter connection. Waiting on filter conversion part from Andair--its in the mail.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.