Installing the Aerosport bagge door strut. Drilled attachment to seat back brace. Ready for paint.
Reinstalled pilot right brake master cylinder that was overhauled by Matco. Refilled brake lines and checked for leaks.
Continued work on right door hinges. Had attempted to drill hinge that had been TIGed shut. Was able to get forward hinge outer two holes drilled. Could have been a little more inboard. Aft didn't go well, so I contacted Van's and got the maufacturer and will get two new hinges properly drilled to my specifications. Just need to determine how much more inboard to make them.
Installed floating platenuts for top attach point of forward fuselage sidpanels.