Date:
4-11-2013
Number of Hours:
4.00
Manual Reference:
Brief Description:
Wiring Day #5
Finished fabricating ELT power and gps signal cable- could they make the connections any smaller? Routed cable from ELT in tail to forward panel.
Installed adel clamps for air vent shutoff valve and dome light power wires.
Finished fabricating elevator trim cable and installed. Routed up to where TCW trim relay will be installed.
Found I had the rudder cables crossing the wrong way, so I corrected that issue.
Enlarged the aft right instrument shelf cable pass thru for the GDL39 cable. Also, completed splicing the entension to the supplied cable.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
1174
3570
Avionics
105
330
Empennage
143
284
Engine
205
918
Fuselage
475
1411
Miscellaneous
11
48
Wings
235
579
Copyright © 2001-2024 Matronics. All Rights Reserved.