Re-assembled brake pedals and rudder pedal hangers after powder coating color change. Installed unit into fuselage. Reattached Bonaco brake lines to brake pedals. Adusted fit of hanger for Matco brake reservoir. With forward fuselage in place, drilled #12 mounting holes for AN3 bolts.
Measured location for tunnel vent line hole. Drilled 2" hole 3 1/2" aft of split in aft tunnel cover. Deburred hole. Installed "T" and installed tunnel covers to check fit.