Finished filling and shaping Rosen visor mounts on door posts. Ready for primer.
Drilled ELT mount for J-channel attach points.
Fabricated version 2 of the vent valve mount. Lengthened attachment point to spread out load and installed a hinge to allow valve to move without flexing j-channel. Ready for primer.