KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  5-18-2012
Number of Hours:  6.00
Manual Reference:  45 and 48
Brief Description:  Doors Day #15 , Wheel Pants Day #5

Started today by adding additional Epoxy/flox to insdie of aft fairings. Cleaned up faring brackets and drilled holes to #19. Ready for platenuts.

Installed pins in door gear. Installed and safetied the lower forward rack and mid rack in place. Installed door handle in place. Painted lock release lever and installed. Right handle internal platenut stripped, so it took awhile to remove and replace. Still some work left with one rivet holding platenut in place.

Removed and deburred gear leg fairing hinges. Reinstalled hinge and countersunk gear leg fairings.

Adjusted nose gear fairing fit. Trimmed aft fairing lip. Marked and drilled #40 the
combined fairing.

Marked and trimmed nose gear fork fairing.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.