KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  5-16-2012
Number of Hours:  6.00
Manual Reference:  48
Brief Description:  Main wheel pants day #3

Continued working on doors. Applied UV Smooth Prime to door recess and sanded. Still more work to do.

Dropped plumb bob from center of fuselage at firewall and an aft bulkhead. Snapped a chalk line. mearsured outside support and smapped second line. From this line, wheel pants was aligned with aircarft centerline and also leveled front to back. Holes were drilled through fairning at marked locations. Removed and sanded insdied of fairings at drilled locations. Tapped holes in fairing brack for 6/32" screws to hold on fairings during next step. Taped and mold relaesed fairing brackets. Mixed epoxy/flox mixture and built up area at fairing screw holes. Allowed to cure for several hours and then removed before fully sured to prevent mixture from locking around edges of fairing bracket and making it very difficult to remove.

Trimmed nose gear faring and started sanding to improve seam fit.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.