KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  5-26-2011
Number of Hours:  3.00
Manual Reference:  31, 33, 34, 35
Brief Description:  Finished Baggage Door and Cont. Access panels

Sect. 31 Fluted and match drilled the two instrument panel attach flanges.

Sect. 33 Finished riveting the F-1028 baggage bulkhead channel in place at the bottom.

Sect. 34 Changed how baggage door hinge is attached to fuselage. Riveted K1000-6 nutplates to F-1058 hinge frame. Then riveted the hinge frame to fuselage per plans. Countersunk
hinge for #6 screw and attached door to frame. Match drilled the F-1081 left baggage cover and deburred common holes. Installed insulation and then riveted F-1081 in place.

Sect. 35 Final drilled #19 all holes in all cover plates this section. Installed insulation in sidewalls at
passengers seats.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.