KitLog pro

Powered By Kitlog Pro v2.0

Steven's RV-9A
' style=
Date:  11-29-2017
Number of Hours:  1.50
Manual Reference:  OIL COOLER
Brief Description:  prepped all the parts of the oil cooler

Prepped all the parts to the oil cooler.

Found all the bolts. Made the tube spacers.

Filed down the Oil Cooler to fit in the opening.

I am going to hold off installation of the Oil cooler until I take the baffles apart, reinforce the Oil Cooler area, and paint the baffles this Saturday.

No photos tonight.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.