KitLog pro

Powered By Kitlog Pro v2.0

Steves S-20 Build Site.
' style=
Date:  2-24-2016
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Prepared the wing reinforcements and patches.

I scuffed all the plastic wing reinforcements, modified the aileron hinge exits per the manual, and fabricated a new reinforcement to go around the the temperature sender I mounted in the bottom of the RH wing.

* I used a 3D printer at work to print out a 2" diameter wheel with a small hole in the middle and used that to trace around the plastic reinforcements leaving an outline for properly sized cover patches.

* I started marking out the locations on the wing panels, and will finish and start gluing next time.
' style=

Reinforcements and patches ready to go.

Reinforcements and patches ready to go.

' style=

Using the spacer wheel.

Using the spacer wheel.

' style=

Started marking out locations.

Started marking out locations.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.