KitLog pro

Powered By Kitlog Pro v2.0

Steves S-20 Build Site.
' style=
Date:  8-6-2015
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Stabilizer Ribs.

Installed the ribs in the horizontal stabilizers and nut plates in the elevators.

Comments:

* I spent a little time straightening the rib mounting tabs and I also ground down a bit of the tab welds so the rib would lay flat, I put a quick coat of paint ever the ground areas to prevent rust in the future. Other than that I just followed the directions.
' style=

Ribs in stabilizer.

Ribs in stabilizer.

' style=

Nut plates for elevator horn.

Nut plates for elevator horn.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.