Today I installed the fuel pickup lines. Then I installed the vent lines. Then I installed the drain lines. I bent the drain lines so that they are in the bottom most part of the tank so that I can drain all the water in the tanks. I will PRC the lines down and do a final seal of the interior of the tank with PRC on Feb27th. I will wait 2 weeks then do a leak check. If all is good I wil installed the lids.