KitLog pro

Powered By Kitlog Pro v2.0

SEAN'S WEB SITE
' style=
Date:  2-7-2007
Number of Hours:  1.50
Manual Reference:  Sec. 6-3, DWG 6
Brief Description:  Vertical Stabilizer Skin Preperation

I received the new vertical stabilizer skin from Van's. I clecoed it to the VS skeletal structure to ensure hole aligniment was correct. I used the soldering iron to remove the vinyl covering, in strips, from the rivet lines of the skin. I then drilled and deburred all skin to rib and spar holes to #40 and used the pnuematic squeezer and 3/32" dimple die to dimple all skin to rib/spar holes. I then primed the inside rivet lines of the VS skin.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.