While Ralph was doing his thing I was working on misc other items. I began by reinstalling the parking brake cable and getting it attached and the cable tied off well.
I looked at the smoke tank to get an idea on what to do to get the attachment of the tank complete. I also have to find a place to mount the manifold on the firewall and get the electrical connections.
I also spent time crunched in the cockpit floorboard area getting wires laced in the gear towers which was a tedious and sometimes arduous task. I also worked on the floor cubby area on the right side where the fiberglass bin will mount to get an idea of tying the wires to the floor in that area.
Of course there is assisting Ralph when needed.....