KitLog pro

Powered By Kitlog Pro v2.0

Bob's RV-8 Build Site
Work Logs Found: 21
Category Work Time: 95 Hours
 Date
Hours
Work Log Summary

Details

 07-14-2024
0.00
Battery Hold Down, Prop, Cowles, Brakes #2
Details
       

 07-14-2024
8.40
Battery Hold Down, Prop, Cowles, Brakes #1
Details
       

 07-13-2024
1.90
Fabricated Stainless Steel Battery Strap
Details
     

 07-12-2024
3.60
Received and installed Autopilot Servos
Details
       

 07-06-2024
6.70
Aileron Bracket, Pitch Servo, Trim Tab
Details
       

 07-05-2024
0.00
Wiring, Wint Tips, Propeller #2
Details
       

 07-05-2024
7.50
Wiring, Wint Tips, Propeller #1
Details
       

 07-04-2024
6.30
Right Aileron Bracket & Cockpit Work
Details
       

 07-03-2024
1.90
Wiring and Fuel Selector
Details
       

 07-02-2024
7.40
Lighting, Trim Tab, Pitot Tube
Details
       

 07-01-2024
5.70
Wingtips, Electrical, Vents
Details
       

 06-29-2024
6.70
Wing Tip Wires, Lenses, Priming Fairings
Details
       

 06-28-2024
2.40
Wing Tip Lights and Rudder
Details
       

 05-31-2024
2.50
Rudder Installed and Left Fuel Tank Bracket
Details
       

 05-27-2024
4.80
Wing Gap Fairings and Fuel Tank Wing Brackets
Details
       

 04-20-2024
7.60
Complete Install/Rig Flaps - Install Magnetometer
Details
       

 04-14-2024
0.00
Flaps, Ailerons, and Electrical #2
Details
       

 04-14-2024
6.20
Flaps, Ailerons, and Electrical #1
Details
       

 04-13-2024
7.60
Flaps and Elevators
Details
       

 04-06-2024
0.00
Wing Bolts, Ailerons, and Wiring #2
Details
       

 04-06-2024
8.20
Wing Bolts, Ailerons, and Wiring #1
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.