Date
|
Hours
|
Work Log Summary

|
Details

|
01-18-2023
|
5.80
|
Complete Baffle Parts and Remove Baffles
|
Details
|
|
|
01-17-2023
|
6.10
|
Complete Baffle Seal Brackets
|
Details
|
|
|
01-16-2023
|
7.40
|
Front Baffles completed and installed baffles
|
Details
|
|
|
01-15-2023
|
7.60
|
Baffles and Snorkle
|
Details
|
|
|
01-14-2023
|
7.30
|
Engine Baffles & Snorkle
|
Details
|
|
|
01-13-2023
|
4.80
|
Finish and Rivet Baffles
|
Details
|
|
|
01-12-2023
|
2.80
|
Baffle Flanges and Prep
|
Details
|
|
|
01-11-2023
|
1.80
|
Baffles Misc
|
Details
|
|
|
01-10-2023
|
1.80
|
Baffle and Cowl Ducts
|
Details
|
|
|
01-08-2023
|
3.90
|
Cowl Inlets and Baffle Trimming
|
Details
|
|
|
01-07-2023
|
3.70
|
Baffles, Oil Line, Cowl Inlet Ducts
|
Details
|
|
|
01-06-2023
|
1.40
|
Oil Line Hole in RIght Ramp Baffle
|
Details
|
|
|
01-05-2023
|
2.20
|
Baffle Seal Backup Angles
|
Details
|
|
|
01-04-2023
|
1.90
|
Flanges for Rear Baffles
|
Details
|
 |
|
01-03-2023
|
2.10
|
Baffle Ignition Wire Pass-thru's
|
Details
|
|
|
01-02-2023
|
5.40
|
Rear Baffle Flanges
|
Details
|
|
|
01-01-2023
|
2.60
|
Baffle Flanges
|
Details
|
|
|
12-31-2022
|
4.80
|
Baffle Conical Gusset
|
Details
|
|
|
12-30-2022
|
4.80
|
Front Baffle, Oil Cooler Support & Filter Mount
|
Details
|
|
|
12-30-2022
|
1.50
|
Cut top cowling inlets
|
Details
|
 |
|
12-29-2022
|
1.90
|
Sand Right Side of Canopy Skirt
|
Details
|
 |
|
12-29-2022
|
3.00
|
Baffles
|
Details
|
 |
|
12-28-2022
|
3.60
|
Baffle Angle Clips
|
Details
|
|
|
12-27-2022
|
3.20
|
Front Engine Baffles and Left Ramp Support plate
|
Details
|
|
|
12-22-2022
|
1.90
|
Left Ramp Support Plate and Right Ramp Baffle
|
Details
|
|
|
12-21-2022
|
1.40
|
Baffles
|
Details
|
|
|
12-20-2022
|
1.80
|
Work Left Ramp and Filter Brackets
|
Details
|
 |
|
12-19-2022
|
2.10
|
More Baffle Tweaking
|
Details
|
|
|
12-18-2022
|
3.90
|
More work on Ramps and Forward Baffles
|
Details
|
|
|
12-17-2022
|
4.70
|
Ramps and Snorkle
|
Details
|
|
|
12-16-2022
|
3.60
|
Snorkle-Left Inlet Ramp-Cowl Inlets
|
Details
|
|
|
12-15-2022
|
1.70
|
Modify Snorkle
|
Details
|
|
|
12-14-2022
|
2.30
|
Snorkle & Ramp
|
Details
|
|
|
12-13-2022
|
1.40
|
Ramp and Snorkle
|
Details
|
 |
|
12-12-2022
|
1.60
|
Left Inlet Baffle & Snorkle
|
Details
|
 |
|
12-11-2022
|
3.30
|
Left Ramp and Snorkle Work
|
Details
|
 |
|
12-10-2022
|
4.30
|
Front Bafffle and Cowling
|
Details
|
|
|
12-08-2022
|
1.40
|
Front Baffles
|
Details
|
 |
|
12-07-2022
|
1.20
|
Super-fil Right Canopy Skirt
|
Details
|
 |
|
12-06-2022
|
3.90
|
Trim and Finish Baffle Edges
|
Details
|
|
|
12-05-2022
|
3.20
|
More Baffle Work
|
Details
|
|
|
12-01-2022
|
5.80
|
Baffles
|
Details
|
|
|
11-30-2022
|
4.40
|
Aileron Bellcrank Brack Upgrade #4
|
Details
|
 |
|
11-23-2022
|
0.70
|
Aileron Bellcrank Brack Upgrade #3
|
Details
|
|
|
11-22-2022
|
3.20
|
Aileron Bellcrank Brack Upgrade #2
|
Details
|
|
|
11-21-2022
|
1.10
|
Aileron Bellcrank Brack Upgrade
|
Details
|
 |
|
11-12-2022
|
2.80
|
Sand and SuperFil Canopy Skirt
|
Details
|
|
|
11-11-2022
|
1.10
|
Sanding Skirt on Canopy
|
Details
|
 |
|
11-10-2022
|
2.00
|
Glass the Rivets
|
Details
|
|
|
11-09-2022
|
2.30
|
Oil Cooler Adapter
|
Details
|
|
|
11-08-2022
|
5.10
|
Baffle, Oil Cooler, & Misc
|
Details
|
|
|
11-07-2022
|
2.20
|
Snorkle & Oil Cooler
|
Details
|
|
|
11-06-2022
|
2.30
|
Working Left Baffle Inlet Ramp
|
Details
|
|
|
11-05-2022
|
8.20
|
Another Baffle Session
|
Details
|
|
|
11-04-2022
|
3.10
|
Working the Right Inlet Baffle Ramp
|
Details
|
|
|
11-03-2022
|
1.70
|
Baffles general cleanup and fitting
|
Details
|
 |
|
11-02-2022
|
1.50
|
Baffle Fitting
|
Details
|
 |
|
11-01-2022
|
3.10
|
Baffles for Cylinders 1 & 2
|
Details
|
|
|
10-31-2022
|
2.60
|
Work on Baffles 3 & 4
|
Details
|
|
|
10-30-2022
|
3.60
|
Baffle (cont)
|
Details
|
|
|
10-29-2022
|
10.30
|
A Baffling Session
|
Details
|
|
|
10-28-2022
|
2.10
|
Sand Cowling Edges
|
Details
|
|
|
10-27-2022
|
1.30
|
Baggage Door Work
|
Details
|
|
|
10-26-2022
|
1.90
|
Mark Cowling for Final Trim
|
Details
|
 |
|
10-25-2022
|
0.00
|
ICON Flashlight worked great!!!
|
Details
|
|
|
10-25-2022
|
1.20
|
Completed Drilling Top Cowling Hinge
|
Details
|
|
|
10-24-2022
|
0.00
|
Fix the old Roller Bag
|
Details
|
|
|
10-22-2022
|
7.10
|
Top & Bottom Cowl Side Cuts
|
Details
|
|
|
10-21-2022
|
1.00
|
Top Skin and Baggage Gas Spring
|
Details
|
|
|
10-16-2022
|
3.20
|
Bottom Cowling (cont)
|
Details
|
|
|
10-15-2022
|
5.20
|
Begin Cutting Bottom Cowl
|
Details
|
|
|
10-14-2022
|
2.70
|
Cut and Fit Top Cowl
|
Details
|
|
|
10-13-2022
|
1.80
|
Level Airplane and Mark for Cowling Trimming
|
Details
|
|
|
10-12-2022
|
1.40
|
Completed Baggage Door Latch Blocks
|
Details
|
|
|
10-11-2022
|
2.30
|
Front Baggage Door Blocks
|
Details
|
|
|
10-10-2022
|
4.30
|
Baggage Door and Blocks
|
Details
|
|
|
10-09-2022
|
2.20
|
More Baggage Door work
|
Details
|
|
|
10-08-2022
|
0.00
|
Trip to Florida
|
Details
|
|
|
09-25-2022
|
1.80
|
Work Top Cowling and Baggage Door Install
|
Details
|
|
|
09-24-2022
|
3.60
|
Work on Top Cowl and Oil Door #2
|
Details
|
|
|
09-23-2022
|
1.10
|
Fab Oil Door
|
Details
|
|
|
09-20-2022
|
0.00
|
Novak Kolb Trip
|
Details
|
|
|
09-19-2022
|
1.70
|
Start working on Cowling
|
Details
|
 |
|
09-07-2022
|
1.90
|
Shop Clean up - Carts
|
Details
|
|
|
09-06-2022
|
2.00
|
Shop Clean up - Benches
|
Details
|
|
|
09-05-2022
|
4.00
|
Complete Top Skin and Misc
|
Details
|
|
|
09-05-2022
|
4.10
|
Complete Top Skin and Misc
|
Details
|
|
|
09-04-2022
|
5.10
|
Rivet Top Skin
|
Details
|
|
|
09-03-2022
|
4.10
|
Forward Skin Supportw, Skybolt Flanges, Wiring
|
Details
|
|
|
09-03-2022
|
4.10
|
Forward Skin Support, Skybolt Flanges, Wiring (co
|
Details
|
|
|
09-02-2022
|
1.50
|
Worked on dressing some wiring with Ralph
|
Details
|
  |
|
08-31-2022
|
2.10
|
Install Red Cube Bracket, Fittings, & Safety Wire
|
Details
|
|
|
08-30-2022
|
2.40
|
Finish Red Cube Bracket
|
Details
|
|
|
08-29-2022
|
2.10
|
Red Cube Bracket
|
Details
|
|
|
08-28-2022
|
2.70
|
Completed Cowling Spacer Front Plate
|
Details
|
|
|
08-21-2022
|
0.00
|
Trip to DFW Novak Aircraft Factory
|
Details
|
|
|
08-17-2022
|
1.40
|
Cowlng Spacer
|
Details
|
|
|
08-15-2022
|
1.90
|
Cowling Spacer
|
Details
|
 |
|
08-14-2022
|
3.90
|
Cowling Spacer (cont)
|
Details
|
|
|
08-13-2022
|
3.10
|
GPS hole in top skin / Cowling Spacer
|
Details
|
|
|
08-11-2022
|
0.90
|
Finish up Cowling Spacer
|
Details
|
  |
|
08-10-2022
|
2.60
|
Red Cube Line & Cowling Spacer
|
Details
|
|
|
08-09-2022
|
1.40
|
Design Cowling Spacer
|
Details
|
 |
|
08-07-2022
|
1.30
|
Red Cube Hose & GPS Antenna
|
Details
|
|
|
08-06-2022
|
7.20
|
OAT & Pitot-Static Lines
|
Details
|
|
|
08-06-2022
|
2.50
|
AOA Mount
|
Details
|
 |
|
07-30-2022
|
5.20
|
Avionics Configuration, Hoses and Misc
|
Details
|
|
|
07-22-2022
|
0.70
|
New Dessicant
|
Details
|
 |
|
07-14-2022
|
3.20
|
Dimmer Control Spacers & Starter Cable v2.0
|
Details
|
|
|
07-13-2022
|
2.50
|
Configure Garmins and spacers
|
Details
|
|
|
07-12-2022
|
1.60
|
Measure Throttle Body/ Servo Hose & Organize
|
Details
|
|
|
07-10-2022
|
1.40
|
FT-60 and Shelves
|
Details
|
 |
|
07-09-2022
|
8.50
|
Working Avionics
|
Details
|
|
|
07-05-2022
|
2.40
|
Fittings and Starter Cable
|
Details
|
 |
|
07-04-2022
|
1.30
|
FT-60 Red Cube
|
Details
|
|
|
07-03-2022
|
4.80
|
Ralph back in the shop
|
Details
|
|
|
07-03-2022
|
4.00
|
Console Wiring and Clamp
|
Details
|
|
|
07-02-2022
|
2.60
|
Cable Support Bracket and more Research
|
Details
|
  |
|
07-01-2022
|
1.50
|
Temp Install of Fuel Servo and Exhaust
|
Details
|
|
|
06-30-2022
|
1.30
|
Oil Cooler Fittings and Hose Measuring
|
Details
|
 |
|
06-28-2022
|
1.90
|
Work Photos and Engine Standoff
|
Details
|
|
|
06-27-2022
|
1.10
|
Install Throttle Body & Take Photos
|
Details
|
|
|
06-26-2022
|
4.80
|
Ralph working on Electrical
|
Details
|
|
|
06-26-2022
|
3.50
|
Misc Electrical and Avionics Items
|
Details
|
|
|
06-25-2022
|
4.70
|
Ralph Assistance with Electrical
|
Details
|
|
|
06-25-2022
|
2.50
|
Finish TCW Mount
|
Details
|
|
|
06-24-2022
|
1.30
|
TCW Hold Down Buttons and Mount
|
Details
|
|
|
06-23-2022
|
1.40
|
TCW Battery hold downs
|
Details
|
|
|
06-22-2022
|
0.00
|
Pensecola Trip to see the Twins
|
Details
|
|
|
06-18-2022
|
1.60
|
Repair pins on GTN-650
|
Details
|
|
|
06-16-2022
|
2.00
|
Smoke Tank Feed Line
|
Details
|
|
|
06-16-2022
|
1.20
|
Garmin G3X update and GTN-650
|
Details
|
  |
|
06-13-2022
|
2.40
|
Clean Shop & Smoke Hose
|
Details
|
|
|
06-13-2022
|
2.50
|
Attach Engine Mount & Misc items
|
Details
|
|
|
06-12-2022
|
10.50
|
EPIC DAY.....Avionics Energized & Engine Hung!!!
|
Details
|
|
|
06-11-2022
|
3.30
|
Right Switching Console & Starter Light (cont)
|
Details
|
|
|
06-11-2022
|
3.30
|
Right Switch Console (Part 1)
|
Details
|
|
|
06-10-2022
|
7.80
|
Ralph over for a work session
|
Details
|
|
|
06-10-2022
|
3.00
|
Landing Gear Work
|
Details
|
|
|
06-10-2022
|
0.00
|
Babysitting and Building
|
Details
|
|
|
06-08-2022
|
1.70
|
Starter Switch Wires
|
Details
|
 |
|
06-07-2022
|
2.60
|
Smoke tank and wire tying
|
Details
|
|
|
06-06-2022
|
1.60
|
Pmag Ground Wire & Remove Smoke Tank
|
Details
|
|
|
06-05-2022
|
0.00
|
Women Can Fly Event at HWY
|
Details
|
|
|
06-04-2022
|
0.00
|
Women Can Fly Event at HWY
|
Details
|
|
|
06-03-2022
|
0.80
|
Pmag Wire Harness
|
Details
|
|
|
06-02-2022
|
1.60
|
Tie Wires and Remove Ground Wire from Bundle
|
Details
|
|
|
06-01-2022
|
2.60
|
Regulators
|
Details
|
|
|
05-31-2022
|
2.90
|
More Right Console Wiring
|
Details
|
 |
|
05-30-2022
|
3.90
|
Right Console and misc
|
Details
|
|
|
05-29-2022
|
2.50
|
Right Console Panel Wiring
|
Details
|
 |
|
05-28-2022
|
2.30
|
Complete Smoke Tank Install
|
Details
|
|
|
05-27-2022
|
1.50
|
Right Console Warning Lights
|
Details
|
 |
|
05-25-2022
|
1.80
|
Smoke Tank & misc
|
Details
|
|
|
05-24-2022
|
1.70
|
Shop Clean up
|
Details
|
|
|
05-23-2022
|
2.30
|
Vans Call and bunch of misc stuff
|
Details
|
|
|
05-22-2022
|
2.00
|
Stick Labels
|
Details
|
 |
|
05-21-2022
|
2.00
|
Regulators and Smoke Tank
|
Details
|
|
|
05-21-2022
|
7.00
|
Landing Gear and Sensors
|
Details
|
|
|
05-20-2022
|
1.50
|
Prime Parts Move stuff to shop
|
Details
|
 |
|
05-19-2022
|
2.40
|
Wheels & Tires Assembled
|
Details
|
|
|
05-18-2022
|
1.30
|
Wheel Fairing Parts
|
Details
|
|
|
05-17-2022
|
2.70
|
Remake Canopy Handle (cont)
|
Details
|
|
|
05-16-2022
|
2.20
|
Wheels, Brakes, and Canopy Handle
|
Details
|
|
|
05-15-2022
|
4.40
|
Smoke Tank Manifold and Lines
|
Details
|
|
|
05-14-2022
|
5.00
|
Check power and grounds and misc wiring
|
Details
|
|
|
05-13-2022
|
2.60
|
Smoke Tank Manifold
|
Details
|
|
|
05-12-2022
|
1.70
|
Epoxy Smoke Tank Mount & Misc
|
Details
|
|
|
05-11-2022
|
2.30
|
Smoke Pump Motor Mount (cont)
|
Details
|
|
|
05-10-2022
|
1.10
|
Motor Mount for Smoke Pump
|
Details
|
 |
|
05-08-2022
|
4.10
|
Smoke Tank Install (cont)
|
Details
|
|
|
05-07-2022
|
4.30
|
Smoke Tank Installation
|
Details
|
|
|
05-04-2022
|
1.60
|
Floor panel & Control Stick Adel Clamp
|
Details
|
|
|
05-03-2022
|
2.20
|
AOA Lines - Lacing - F/W Pass Thru's
|
Details
|
|
|
04-27-2022
|
1.30
|
Install Pitot Tube Line
|
Details
|
|
|
04-26-2022
|
2.00
|
Advanced AOA Plumbing (cont)
|
Details
|
|
|
04-25-2022
|
2.10
|
Advanced AOA Plumbing
|
Details
|
|
|
04-24-2022
|
3.10
|
Tying wires and lost washer
|
Details
|
|
|
04-23-2022
|
7.20
|
Ralph over to help
|
Details
|
|
|
04-23-2022
|
5.00
|
Electrical and Misc
|
Details
|
|
|
04-22-2022
|
1.70
|
Cable Brackets
|
Details
|
|
|
04-21-2022
|
1.80
|
Misc Electrical Work
|
Details
|
|
|
04-20-2022
|
0.90
|
Electrical Bay Ground Wires
|
Details
|
 |
|
04-19-2022
|
2.90
|
Ground Wires in Electrical Bay
|
Details
|
|
|
04-17-2022
|
0.50
|
Electrical Bay Ground wires
|
Details
|
  |
|
04-08-2022
|
0.80
|
Electrical Bay Wire Routing
|
Details
|
 |
|
04-07-2022
|
1.50
|
Pickle and Route Wires
|
Details
|
|
|
03-29-2022
|
3.00
|
Ralph Assisting again tonight
|
Details
|
|
|
03-29-2022
|
4.00
|
Bob the wire router
|
Details
|
|
|
03-28-2022
|
3.50
|
Ralph assistance again
|
Details
|
|
|
03-28-2022
|
4.00
|
Firewall Pass thru and wiring
|
Details
|
|
|
03-27-2022
|
4.00
|
Ralph Assistance Again
|
Details
|
|
|
03-27-2022
|
5.00
|
Misc items for firewall
|
Details
|
|
|
03-26-2022
|
4.00
|
Ralph in the house again!
|
Details
|
|
|
03-26-2022
|
4.00
|
Continued on various electrical stuff
|
Details
|
|
|
03-25-2022
|
2.50
|
Right Console Switching Panel #3
|
Details
|
|
|
03-24-2022
|
2.90
|
Right Console Switching Panel #2
|
Details
|
|
|
03-23-2022
|
2.20
|
Right Console Switching Panel #1
|
Details
|
|
|
03-22-2022
|
2.80
|
Right Eyebrow Panel and Console
|
Details
|
|
|
03-21-2022
|
2.10
|
Pitot and Wing Landing Lights
|
Details
|
  |
|
03-20-2022
|
3.10
|
Pitot and OAT Probe Wiring
|
Details
|
|
|
03-19-2022
|
4.50
|
Panel Switch Wiring
|
Details
|
|
|
03-18-2022
|
2.80
|
Buss Short Troubleshoot / Panel Lettering
|
Details
|
|
|
03-17-2022
|
2.60
|
Wire GT-50 and Boost Pump Switch
|
Details
|
 |
|
03-16-2022
|
0.90
|
Fuse-Relay Panel Lettering
|
Details
|
 |
|
03-15-2022
|
1.60
|
Spar Cap Installation (cont)
|
Details
|
|
|
03-14-2022
|
3.10
|
Spar Cap Installation
|
Details
|
|
|
03-10-2022
|
2.60
|
Modify Spar Caps
|
Details
|
|
|
03-08-2022
|
1.70
|
Sort & Tie Wires in Fuse-Relay Bay
|
Details
|
|
|
03-07-2022
|
1.80
|
Fuse Block Matrix & Starter Engaged Light
|
Details
|
|
|
03-06-2022
|
1.00
|
Fuse-Relay Bay
|
Details
|
|
|
03-03-2022
|
2.20
|
Fuse Block Wiring #6
|
Details
|
 |
|
03-02-2022
|
2.30
|
Fuse Block Wiring #5
|
Details
|
 |
|
03-01-2022
|
2.80
|
Fuse Block Wiring #4
|
Details
|
|
|
02-28-2022
|
2.20
|
Fuse Block Wiring #3
|
Details
|
|
|
02-27-2022
|
3.60
|
Fuse Block Wiring #2
|
Details
|
|
|
02-26-2022
|
5.40
|
Fuse Block Wiring #1
|
Details
|
|
|
02-25-2022
|
5.30
|
Wire CB Panel (cont)
|
Details
|
|
|
02-24-2022
|
3.70
|
Wire CB Panel
|
Details
|
 |
|
02-23-2022
|
0.00
|
Grandchildren Riley and Levi Visit
|
Details
|
|
|
02-22-2022
|
2.40
|
Panel Switch Wires #6
|
Details
|
 |
|
02-21-2022
|
6.30
|
Panel Switch Wires #5
|
Details
|
 |
|
02-20-2022
|
2.50
|
Panel Switch Wires #4
|
Details
|
  |
|
02-19-2022
|
2.00
|
Panel Switch Wires #3
|
Details
|
 |
|
02-18-2022
|
3.50
|
Panel Switch Wires #2
|
Details
|
|
|
02-17-2022
|
3.30
|
Panel Switch Wiring #1
|
Details
|
 |
|
02-16-2022
|
2.20
|
Ignition Buss
|
Details
|
|
|
02-15-2022
|
2.30
|
Ignition Buss
|
Details
|
|
|
02-14-2022
|
0.70
|
Ignition Buss Bar
|
Details
|
 |
|
02-13-2022
|
5.80
|
Wiring Pitch Servo & Ignition Buss
|
Details
|
|
|
02-13-2022
|
5.80
|
Ralph back over to help with electircal
|
Details
|
|
|
02-10-2022
|
1.20
|
Panel Indicator Light Ground Wires
|
Details
|
|
|
02-09-2022
|
2.30
|
Panel Indicator Lights Dsub ground
|
Details
|
|
|
02-08-2022
|
2.20
|
Make Dsub bracket for Panel Indicator Light Ground
|
Details
|
|
|
02-07-2022
|
1.90
|
Right Console Panel & Dsub bracket
|
Details
|
|
|
02-06-2022
|
2.80
|
IGN Buss and Right Console Panel
|
Details
|
|
|
02-05-2022
|
7.00
|
Wiring Help from Ralph
|
Details
|
|
|
02-05-2022
|
7.80
|
CB Panel and Instrument Panel
|
Details
|
|
|
02-03-2022
|
1.70
|
Complete Buss Bar and Work CB Panel
|
Details
|
 |
|
02-02-2022
|
2.90
|
Labels and CB Wiring
|
Details
|
|
|
02-01-2022
|
3.60
|
Wire Chrono and labeling
|
Details
|
 |
|
01-31-2022
|
1.90
|
Pitch Servo
|
Details
|
|
|
01-30-2022
|
3.10
|
Labeling Panels #2
|
Details
|
|
|
01-29-2022
|
7.10
|
Labeling Panels #1
|
Details
|
|
|
01-28-2022
|
3.90
|
Wing Lights Wiring
|
Details
|
|
|
01-27-2022
|
3.10
|
Wiring Wing Lights
|
Details
|
|
|
01-26-2022
|
1.50
|
Nav and Suntail Connector & Labels
|
Details
|
|
|
01-25-2022
|
2.40
|
Wing light wiring
|
Details
|
|
|
01-24-2022
|
1.10
|
Lighting wires
|
Details
|
 |
|
01-23-2022
|
5.20
|
Rudder Fairing, Strobe Lights & Misc
|
Details
|
|
|
01-22-2022
|
4.60
|
Strobe lights and Misc
|
Details
|
|
|
01-21-2022
|
0.60
|
Remove Flooring & Seat
|
Details
|
 |
|
01-20-2022
|
2.20
|
Shop Clean up and General Wiring
|
Details
|
 |
|
01-19-2022
|
1.70
|
Flood Light Grounds and AOA wiring
|
Details
|
 |
|
01-18-2022
|
2.70
|
Ground Wire Terminals for Panel Ground Block
|
Details
|
|
|
01-17-2022
|
5.50
|
Switch washers and wiring
|
Details
|
|
|
01-16-2022
|
3.30
|
Wing Tips stiffiners and hinge blocks
|
Details
|
|
|
01-15-2022
|
5.20
|
Make and Install Lower Wing Tip Stiffiners
|
Details
|
|
|
01-14-2022
|
3.40
|
Complete and Bond Stiffiners
|
Details
|
|
|
01-13-2022
|
1.30
|
Foam Stifffiners
|
Details
|
 |
|
01-12-2022
|
1.40
|
Seat test, selected upholestry, and redied for shi
|
Details
|
|
|
01-10-2022
|
1.50
|
Reinstall Floors and seats
|
Details
|
|
|
01-09-2022
|
4.60
|
Wingtip Pin Retainer Blocks & Foam Stiffiners
|
Details
|
|
|
01-08-2022
|
1.70
|
Wing Tip Hinge Blocks
|
Details
|
 |
|
01-08-2022
|
3.00
|
Aeroled Landing and Navigation Lights
|
Details
|
|
|
01-07-2022
|
2.60
|
AeroLed Lights Installation
|
Details
|
|
|
01-06-2022
|
3.20
|
AeroLED Leftt Landing Light
|
Details
|
|
|
01-05-2022
|
1.70
|
AeroLED Right Landing Light
|
Details
|
|
|
01-04-2022
|
1.30
|
Landing light wingtip install
|
Details
|
 |
|
01-02-2022
|
2.50
|
Canopy Latch and exterior handle
|
Details
|
 |
|
01-01-2022
|
4.20
|
Wing Tip Sanding, Ribs, Lights
|
Details
|
 |
|
01-01-2022
|
2.20
|
Canopy handle latch
|
Details
|
 |
|
12-31-2021
|
3.20
|
Trimmed and flox wing tips
|
Details
|
 |
|
12-31-2021
|
3.00
|
Counterbores for Switches and CB's
|
Details
|
 |
|
12-30-2021
|
4.40
|
GPS Mount and COAX Connectors
|
Details
|
|
|
12-29-2021
|
4.20
|
Wing tip ribs and COAX Cables
|
Details
|
|
|
12-28-2021
|
0.80
|
COAX Connector dry run
|
Details
|
 |
|
12-27-2021
|
2.90
|
Wing Tip Ribs
|
Details
|
|
|
12-26-2021
|
4.90
|
Wing Tip Ribs
|
Details
|
|
|
12-19-2021
|
2.00
|
Handle and Labels
|
Details
|
|
|
12-15-2021
|
1.90
|
Label Work..getting close to done!
|
Details
|
|
|
12-13-2021
|
2.10
|
Floors and run COAX
|
Details
|
|
|
12-12-2021
|
2.40
|
Park Brake and Alt Air Cable Mod #4
|
Details
|
|
|
12-12-2021
|
2.00
|
Label Work
|
Details
|
 |
|
12-11-2021
|
5.30
|
Park Brake and Alt Air Cable Mod #3
|
Details
|
|
|
12-10-2021
|
4.40
|
Park Brake and Alt Air Cable Mod #2
|
Details
|
 |
|
12-09-2021
|
4.50
|
Park Brake and Alt Air Cable Mod
|
Details
|
 |
|
12-09-2021
|
1.60
|
More working with Labels
|
Details
|
  |
|
12-08-2021
|
4.80
|
More label design
|
Details
|
 |
|
12-07-2021
|
1.30
|
More Lettering for panels - Jims stick
|
Details
|
|
|
12-06-2021
|
3.30
|
More work on labels
|
Details
|
  |
|
12-05-2021
|
3.40
|
More panel lettering
|
Details
|
|
|
12-04-2021
|
2.50
|
New Panel Lettering
|
Details
|
 |
|
12-02-2021
|
3.40
|
AMP Bracket & Nylon insulator
|
Details
|
|
|
12-01-2021
|
1.70
|
PIC Stick AMP Connector
|
Details
|
|
|
11-30-2021
|
3.10
|
Seat Height Check & PIC AMP Plug
|
Details
|
|
|
11-29-2021
|
2.70
|
Install Front seat floor - Flap actuator nutplates
|
Details
|
|
|
11-28-2021
|
6.90
|
More Flooring and Hinges & Misc items
|
Details
|
|
|
11-27-2021
|
3.80
|
Remove Flap Actuator & GIB Seat Hinge
|
Details
|
|
|
11-23-2021
|
2.90
|
Reinforce Wing Tip Trailing Edge
|
Details
|
|
|
11-22-2021
|
0.00
|
AOA Positioning (Continued)
|
Details
|
|
|
11-22-2021
|
3.20
|
AOA Display Positioning
|
Details
|
|
|
11-21-2021
|
7.50
|
More Electrical / Avionics
|
Details
|
|
|
11-20-2021
|
4.80
|
CB Panel re-work and Misc
|
Details
|
|
|
11-19-2021
|
2.10
|
PIC Stick & Misc
|
Details
|
 |
|
11-18-2021
|
1.60
|
Mount Fwd D-sub Bracket
|
Details
|
 |
|
11-17-2021
|
1.90
|
D-sub bracket for inputs/outputs
|
Details
|
|
|
11-16-2021
|
2.30
|
Working on labels......again!
|
Details
|
 |
|
11-15-2021
|
2.60
|
Smart Glide Switch and AMP Bracket
|
Details
|
|
|
11-14-2021
|
4.60
|
Left Wingtip rib & misc items
|
Details
|
|
|
11-13-2021
|
7.00
|
Various Avionics Items
|
Details
|
|
|
11-13-2021
|
10.30
|
Ralph in the House for wiring stuff today!
|
Details
|
|
|
11-12-2021
|
1.80
|
Left wing tip rib
|
Details
|
 |
|
11-11-2021
|
2.80
|
Mark Cut lines on wing tips and Rt Tip Rib
|
Details
|
|
|
11-10-2021
|
4.40
|
Canopy handle and GIB Stick wiring
|
Details
|
|
|
11-09-2021
|
2.70
|
Run Glide Switch ground and D-sub, Seats
|
Details
|
|
|
11-08-2021
|
0.70
|
Run wire for SMART GLIDE
|
Details
|
 |
|
11-08-2021
|
1.00
|
Footwell nutplates riveted
|
Details
|
 |
|
11-07-2021
|
2.50
|
Foot well attach screws
|
Details
|
 |
|
11-06-2021
|
0.00
|
Dustin's Wing Attachment Assistance
|
Details
|
 |
|
11-04-2021
|
2.90
|
GIB Control Stick PTT & footwell nutplates
|
Details
|
|
|
11-03-2021
|
1.10
|
GIB Control Stick PTT
|
Details
|
|
|
11-01-2021
|
2.50
|
Misc electrical / GIB control stick
|
Details
|
|
|
10-31-2021
|
5.20
|
Electrical and misc
|
Details
|
|
|
10-30-2021
|
7.80
|
Ralph assistance with electrical
|
Details
|
|
|
10-30-2021
|
4.50
|
Miscellaneous electircal
|
Details
|
 |
|
10-29-2021
|
1.80
|
Remove Powder Coating & Flap motor wiring
|
Details
|
|
|
10-29-2021
|
1.50
|
Checking wing tip hinges
|
Details
|
  |
|
10-28-2021
|
1.10
|
AOA / Seat belt bracket
|
Details
|
  |
|
10-27-2021
|
2.80
|
Flap Position Sensor Mount #8
|
Details
|
|
|
10-26-2021
|
3.70
|
Wing Tips rivet hinges
|
Details
|
|
|
10-25-2021
|
2.20
|
Wing Tips
|
Details
|
 |
|
10-24-2021
|
4.90
|
Wing tips continued
|
Details
|
|
|
10-23-2021
|
5.20
|
Wing Tips
|
Details
|
|
|
10-22-2021
|
3.60
|
More Wing Tip Work
|
Details
|
|
|
10-21-2021
|
2.10
|
Flap Position Sensor Mount #7
|
Details
|
 |
|
10-20-2021
|
1.30
|
Propeller Arrived!
|
Details
|
|
|
10-19-2021
|
2.00
|
Left Wing TIp
|
Details
|
|
|
10-18-2021
|
1.00
|
Wing Tips
|
Details
|
  |
|
10-18-2021
|
0.00
|
Rick Departs
|
Details
|
|
|
10-17-2021
|
9.30
|
Wing Tip Hinges Install
|
Details
|
|
|
10-16-2021
|
5.50
|
Rivet Right Wing Skin
|
Details
|
 |
|
10-15-2021
|
3.30
|
Right Wing Bottom Skin Prep and Misc
|
Details
|
|
|
10-14-2021
|
0.00
|
Ohio Trip and Ricks Panel
|
Details
|
|
|
10-08-2021
|
2.60
|
AOA Microswitch mount and flap sensor mount
|
Details
|
|
|
10-07-2021
|
1.10
|
AOA Flap Micro Mount
|
Details
|
 |
|
10-05-2021
|
2.10
|
Flap Sensor Connectors V2,0
|
Details
|
|
|
10-03-2021
|
4.50
|
Work on Flap Actuator and AOA Flap Switch
|
Details
|
|
|
10-03-2021
|
8.40
|
More Avionics and Electrical
|
Details
|
 |
|
10-02-2021
|
1.70
|
Flap Position Sensor Mount #6
|
Details
|
|
|
10-01-2021
|
0.60
|
Flap Position Sensor Mount #5
|
Details
|
  |
|
09-30-2021
|
2.40
|
Flap Position Sensor Mount #4
|
Details
|
 |
|
09-29-2021
|
1.00
|
Flap Position Sensor Mount #3
|
Details
|
 |
|
09-28-2021
|
3.10
|
Flap Position Sensor Mount #2
|
Details
|
|
|
09-27-2021
|
1.70
|
Flap Position Sensor Mount #1
|
Details
|
|
|
09-26-2021
|
4.30
|
Flap Actuator Wires
|
Details
|
|
|
09-25-2021
|
5.00
|
Install flap weldment and actuator
|
Details
|
 |
|
09-25-2021
|
8.60
|
Avionics work with Ralph
|
Details
|
|
|
09-24-2021
|
1.50
|
Antenna Doubler holes
|
Details
|
 |
|
09-23-2021
|
2.50
|
Rivet in Antenna Doublers
|
Details
|
|
|
09-22-2021
|
2.30
|
Tail Nav/Strobe light wire
|
Details
|
|
|
09-20-2021
|
2.40
|
VOR/ILS/LOC Coax
|
Details
|
 |
|
09-19-2021
|
8.40
|
Routing COAX
|
Details
|
|
|
09-18-2021
|
3.30
|
GPS Coax Routing
|
Details
|
|
|
09-17-2021
|
2.30
|
Dimple Skin for Doublers
|
Details
|
|
|
09-16-2021
|
2.70
|
Antenna Doublers Drill & Debur
|
Details
|
|
|
09-15-2021
|
2.10
|
Relocate Antenna Doublers & XPDR doubler
|
Details
|
|
|
09-14-2021
|
2.10
|
Conduit and Antenna positioning
|
Details
|
|
|
09-13-2021
|
0.00
|
Rons National Cemetary Ceremony
|
Details
|
|
|
09-07-2021
|
1.50
|
Doublers and Conduit
|
Details
|
|
|
09-06-2021
|
8.40
|
Wiring, Conduits, Doublers
|
Details
|
|
|
09-05-2021
|
2.00
|
Roll Servo & GMU 11 Wires
|
Details
|
|
|
09-04-2021
|
3.50
|
ELT Antenna and Cable
|
Details
|
|
|
09-02-2021
|
2.30
|
Conduit & ELT Mount
|
Details
|
 |
|
09-01-2021
|
2.80
|
ELT / GIB stick harness / general wiring
|
Details
|
|
|
08-31-2021
|
2.90
|
ELT Antenna Mount
|
Details
|
|
|
08-29-2021
|
3.20
|
Modify Left wing Duckworth Light
|
Details
|
|
|
08-28-2021
|
9.10
|
ELT and Avionics wire harness
|
Details
|
|
|
08-28-2021
|
3.00
|
Duckwork Lights Modification
|
Details
|
|
|
08-28-2021
|
9.10
|
Airtex ELT install and Harness
|
Details
|
|
|
08-26-2021
|
1.00
|
GIB Light wires and Airtex
|
Details
|
|
|
08-25-2021
|
1.50
|
Airtex Remote & wire ties
|
Details
|
|
|
08-24-2021
|
3.10
|
GIB Light Panel
|
Details
|
|
|
08-23-2021
|
3.30
|
GIB LEMO, Light, and A/P Disconnect
|
Details
|
|
|
08-18-2021
|
1.40
|
Clean and order
|
Details
|
  |
|
08-16-2021
|
2.40
|
Wire routing
|
Details
|
|
|
08-15-2021
|
0.60
|
GIB Music Input
|
Details
|
 |
|
08-12-2021
|
2.20
|
GIB LEMO Routing
|
Details
|
|
|
08-11-2021
|
2.40
|
GIB LEMO
|
Details
|
|
|
08-10-2021
|
3.20
|
GIB Light - A/P Disc - Misc
|
Details
|
|
|
08-09-2021
|
1.10
|
GIB A/P Disconnect & Vetterman
|
Details
|
|
|
08-08-2021
|
4.10
|
PIC Music Jack / GIB LEMO / GIB A/P Disconnect
|
Details
|
|
|
08-07-2021
|
0.50
|
FWF box arrived
|
Details
|
|
|
08-07-2021
|
0.00
|
Assist Rob on Oxygen System
|
Details
|
|
|
08-06-2021
|
2.30
|
AOA wiring and Pilot LEMO
|
Details
|
|
|
08-03-2021
|
1.60
|
AOA Install
|
Details
|
|
|
08-02-2021
|
2.50
|
Relocate AOA Box
|
Details
|
|
|
08-01-2021
|
2.00
|
Advance AOA Install
|
Details
|
 |
|
07-31-2021
|
2.00
|
General Wiring
|
Details
|
 |
|
07-30-2021
|
1.20
|
Modified Adel v 2.0
|
Details
|
|
|
07-29-2021
|
2.10
|
Instrument Panel Ground Bus
|
Details
|
|
|
07-28-2021
|
1.80
|
Headset Jacks-Pilot
|
Details
|
|
|
07-26-2021
|
1.30
|
Headset Jacks GIB
|
Details
|
|
|
07-25-2021
|
1.80
|
LEMO Cutouts
|
Details
|
|
|
07-24-2021
|
1.50
|
LEMO / Jacks position and template
|
Details
|
|
|
07-23-2021
|
3.10
|
GPS Antenna Mount doubler, inventory, ground bus
|
Details
|
|
|
07-22-2021
|
2.30
|
Instrument Ground Block
|
Details
|
|
|
07-21-2021
|
3.00
|
GPS Antenna Mount #7
|
Details
|
|
|
07-20-2021
|
2.90
|
GPS Antenna Mount #6
|
Details
|
|
|
07-19-2021
|
2.40
|
GPS Antenna Mount #5
|
Details
|
|
|
07-18-2021
|
5.80
|
Misc Fuselage items
|
Details
|
|
|
07-17-2021
|
9.10
|
Wiring Harness Installation #2
|
Details
|
|
|
07-16-2021
|
1.50
|
GEA 24 Mount Chafe Protection
|
Details
|
|
|
07-14-2021
|
2.20
|
Inventory FWF Stuff
|
Details
|
|
|
07-12-2021
|
1.80
|
GEA24 mount and Xpdr tray
|
Details
|
|
|
07-11-2021
|
7.50
|
Wiring Harness installation
|
Details
|
|
|
07-10-2021
|
4.20
|
Fab GPS Mount v2.0 #4
|
Details
|
|
|
07-09-2021
|
2.60
|
Fab GPS Mount v2.0 #3
|
Details
|
|
|
07-08-2021
|
1.80
|
Fab GPS Mount v2.0 #2
|
Details
|
|
|
07-07-2021
|
0.80
|
Fab GPS Mount v2.0
|
Details
|
 |
|
07-06-2021
|
3.10
|
Measure and design antenna mount...the next episod
|
Details
|
|
|
07-05-2021
|
0.30
|
Reinstall canopy and harness arrived
|
Details
|
|
|
07-05-2021
|
0.00
|
July 4th Holiday flight to the beach
|
Details
|
|
|
07-04-2021
|
3.70
|
GPS Mount Fab
|
Details
|
|
|
07-03-2021
|
2.20
|
Move wings to shop
|
Details
|
|
|
07-02-2021
|
1.00
|
GPS Mount Design
|
Details
|
 |
|
07-01-2021
|
0.00
|
Men with a mission-RV8 ferry!
|
Details
|
|
|
07-01-2021
|
2.10
|
Dimple top skin F-821-1
|
Details
|
|
|
06-30-2021
|
1.90
|
Dimple and C'snk for upper skin
|
Details
|
|
|
06-29-2021
|
2.00
|
Skybolt Flanges on Firewall #10
|
Details
|
|
|
06-28-2021
|
1.80
|
Skybolt Flanges on Firewall #9
|
Details
|
 |
|
06-27-2021
|
2.80
|
Skybolt Flanges on Firewall #8
|
Details
|
|
|
06-26-2021
|
2.30
|
Skybolt Flanges on Firewall #7
|
Details
|
|
|
06-25-2021
|
1.60
|
Skybolt Flanges on Firewall #6
|
Details
|
|
|
06-24-2021
|
1.70
|
Skybolt Flanges on Firewall #5
|
Details
|
|
|
06-23-2021
|
2.90
|
Skybolt Flanges on Firewall #4
|
Details
|
|
|
06-22-2021
|
1.80
|
Skybolt Flanges on Firewall #3
|
Details
|
|
|
06-21-2021
|
2.50
|
Skybolt Flanges on Firewall #2
|
Details
|
|
|
06-20-2021
|
1.10
|
GIB lighting switch
|
Details
|
|
|
06-19-2021
|
0.00
|
Riley's 4th Birthday Party
|
Details
|
|
|
06-15-2021
|
2.10
|
Skybolt fasteners for firewall
|
Details
|
|
|
06-14-2021
|
1.60
|
Misc - Panel lettering and rivet baggage door supp
|
Details
|
|
|
06-13-2021
|
3.70
|
GIB light assembly
|
Details
|
|
|
06-12-2021
|
2.60
|
AOA complete install
|
Details
|
|
|
06-11-2021
|
2.70
|
AOA Review and complete brackets
|
Details
|
|
|
06-10-2021
|
2.20
|
AOA Brackets and access hole
|
Details
|
|
|
06-09-2021
|
0.80
|
AOA brackets drilled
|
Details
|
 |
|
06-08-2021
|
1.20
|
Locate AOA and start brackets
|
Details
|
|
|
06-07-2021
|
0.60
|
Clear Coat panels
|
Details
|
|
|
06-06-2021
|
4.50
|
Wire Rheostats and Dimmer unit
|
Details
|
|
|
06-05-2021
|
0.70
|
Test ILS/VOR/LOC antenna attachments
|
Details
|
|
|
06-04-2021
|
2.00
|
Antenna Doubler and housekeeping
|
Details
|
|
|
06-03-2021
|
2.40
|
ILS/VOR/LOC Antenna #4
|
Details
|
|
|
06-02-2021
|
2.60
|
ILS/VOR/LOC Antenna #3
|
Details
|
|
|
06-01-2021
|
2.30
|
ILS/VOR/LOC Antenna #2
|
Details
|
|
|
05-31-2021
|
2.20
|
ILS/VOR/LOC Antenna
|
Details
|
|
|
05-30-2021
|
3.20
|
Avionics Access Door
|
Details
|
|
|
05-20-2021
|
1.70
|
Completer heater box cable install
|
Details
|
|
|
05-18-2021
|
2.10
|
Heater box control cable routing
|
Details
|
|
|
05-17-2021
|
2.70
|
Design & fab heater arm attach hardware
|
Details
|
|
|
05-16-2021
|
1.70
|
Heater Cable Attachment
|
Details
|
|
|
05-06-2021
|
0.00
|
Back to Florida with the girls
|
Details
|
|
|
05-05-2021
|
1.00
|
Skybolt familiarization and firewall keeper rivets
|
Details
|
|
|
05-04-2021
|
0.80
|
Install heater box
|
Details
|
|
|
05-03-2021
|
1.60
|
Heater box holes
|
Details
|
|
|
05-01-2021
|
0.30
|
Tailwheel install
|
Details
|
|
|
04-25-2021
|
0.00
|
Side Jobs
|
Details
|
|
|
04-06-2021
|
2.90
|
Landing gear dolly (cont)
|
Details
|
|
|
04-05-2021
|
3.70
|
Landing gear dolly
|
Details
|
|
|
04-04-2021
|
3.80
|
Complete wiring for Flood lights
|
Details
|
|
|
04-03-2021
|
3.10
|
Right Flood Light Wiring
|
Details
|
|
|
04-02-2021
|
3.50
|
Install Static Line and Modify Right Sub-panel
|
Details
|
|
|
03-28-2021
|
0.00
|
Easter Visits
|
Details
|
|
|
03-25-2021
|
1.80
|
Modify Left Sub-Panel on Instrument Panel
|
Details
|
|
|
03-24-2021
|
1.60
|
Post lights & static line
|
Details
|
|
|
03-23-2021
|
2.30
|
Wiring with Ralph - new homebuilder series
|
Details
|
|
|
03-22-2021
|
1.70
|
GIB Stick Modification for PTT (cont)
|
Details
|
|
|
03-21-2021
|
4.70
|
GIB Stick Modification for PTT
|
Details
|
|
|
03-20-2021
|
2.30
|
Heater Box Debacle & Fuse Bay
|
Details
|
|
|
03-19-2021
|
1.30
|
Install Pass-thru
|
Details
|
|
|
03-18-2021
|
1.60
|
Firewall Pass-thru 2 & Voltage Regulators
|
Details
|
|
|
03-17-2021
|
2.90
|
Firewall Pass-thru
|
Details
|
|
|
03-16-2021
|
3.10
|
Wiring and Firewall Pass thru
|
Details
|
|
|
03-15-2021
|
2.10
|
Fuel Pump Wiring complete
|
Details
|
|
|
03-14-2021
|
0.00
|
Making extra pass-thru's
|
Details
|
 |
|
03-11-2021
|
1.00
|
Fuel Pump Wiring
|
Details
|
 |
|
03-09-2021
|
1.10
|
Power Outlet/USB wiring (cont)
|
Details
|
|
|
03-08-2021
|
0.70
|
Power Outlet/USB wiring
|
Details
|
|
|
03-07-2021
|
2.00
|
Power outlet and USB wiring
|
Details
|
|
|
03-06-2021
|
1.50
|
Firewall Pass thru #2
|
Details
|
|
|
03-05-2021
|
2.10
|
Pics and Print for wireing harness
|
Details
|
|
|
03-04-2021
|
2.30
|
PIC and GIB stick wire measure
|
Details
|
  |
|
03-03-2021
|
1.60
|
Co-pilot LEMO measure
|
Details
|
 |
|
03-01-2021
|
1.50
|
Pilot LEMO location and measure
|
Details
|
 |
|
02-28-2021
|
1.80
|
Finish Pass Thru
|
Details
|
|
|
02-27-2021
|
5.50
|
Prototype Pass Thru / LEMOs
|
Details
|
|
|
02-25-2021
|
1.40
|
GMU-11 wire measuring
|
Details
|
|
|
02-24-2021
|
0.80
|
GMU-11 Routing
|
Details
|
 |
|
02-23-2021
|
2.00
|
Measure Trim Wire & start on GMU-11
|
Details
|
|
|
02-22-2021
|
1.30
|
Measuring for Pitch Harness
|
Details
|
|
|
02-21-2021
|
2.20
|
Measuring for Roll Harness
|
Details
|
|
|
02-20-2021
|
2.00
|
Measuring for Avionics Harness & Clean shop
|
Details
|
 |
|
02-18-2021
|
0.00
|
Fab misc parts for Jims project
|
Details
|
|
|
02-17-2021
|
4.20
|
Manifold for smoke system (cont)
|
Details
|
|
|
02-15-2021
|
3.60
|
Manifold for smoke system
|
Details
|
|
|
02-14-2021
|
0.00
|
Cut Jim's panel in shop
|
Details
|
|
|
02-13-2021
|
4.60
|
Avionics Master Relay & Misc
|
Details
|
|
|
02-11-2021
|
1.00
|
Antennas & Hardware arrived
|
Details
|
 |
|
02-09-2021
|
2.40
|
CB Panel Bus Wiring
|
Details
|
|
|
02-08-2021
|
3.50
|
Fuse Bay Bus Wires
|
Details
|
|
|
02-07-2021
|
5.80
|
Routing and securing Bus Wiring
|
Details
|
|
|
02-06-2021
|
3.50
|
Electrical Bay - wiring bus feeds
|
Details
|
|
|
02-05-2021
|
1.00
|
Remove Voltage Regulators for Upgrade
|
Details
|
  |
|
02-04-2021
|
2.60
|
Install Regulators / begin running wires
|
Details
|
|
|
02-03-2021
|
2.30
|
Voltage Regulator Ground Wires
|
Details
|
|
|
02-02-2021
|
1.50
|
Complete Wire Tie Panel
|
Details
|
|
|
02-01-2021
|
2.30
|
Wire tie panel Ver 2.0 (cont)
|
Details
|
|
|
01-31-2021
|
4.50
|
Wire tie panel version 2.0
|
Details
|
|
|
01-30-2021
|
4.40
|
Install Battery Tray and misc
|
Details
|
|
|
01-28-2021
|
1.30
|
Spar Caps & odds and ends
|
Details
|
 |
|
01-27-2021
|
2.30
|
Tailcone Stiffener SL 00014 - complete
|
Details
|
|
|
01-26-2021
|
1.00
|
Tailcone Stiffener SL 00014 - cont
|
Details
|
|
|
01-25-2021
|
0.70
|
Tailcone Stiffener SL 00014
|
Details
|
|
|
01-24-2021
|
2.00
|
Tech data review & vacuum modification
|
Details
|
|
|
01-23-2021
|
1.40
|
Wire routing right gear tower
|
Details
|
|
|
01-22-2021
|
2.80
|
Cubby Bracket
|
Details
|
|
|
01-21-2021
|
2.50
|
Wire Cable Ties
|
Details
|
|
|
01-20-2021
|
1.20
|
Wing wiring routing holes
|
Details
|
 |
|
01-19-2021
|
1.60
|
Conduits
|
Details
|
 |
|
01-18-2021
|
6.50
|
More wire routing - Center section, spar cap, fuse
|
Details
|
|
|
01-17-2021
|
2.10
|
Wire Routing - Grounding
|
Details
|
 |
|
01-16-2021
|
1.50
|
Wire routing Fuse Bay
|
Details
|
|
|
01-15-2021
|
1.30
|
Wire Routing - Edging and Adel Clamp
|
Details
|
|
|
01-14-2021
|
1.80
|
Complete Battery Tray Mod
|
Details
|
 |
|
01-13-2021
|
1.50
|
Modify Battery Tray (cont)
|
Details
|
|
|
01-12-2021
|
1.90
|
Modify Battery Tray
|
Details
|
 |
|
01-11-2021
|
2.60
|
Modify battery tray and tie down panel
|
Details
|
|
|
01-10-2021
|
5.30
|
CB Panel (continued)
|
Details
|
|
|
01-09-2021
|
1.70
|
Begin assembly of CB Panel
|
Details
|
|
|
01-07-2021
|
1.60
|
Sizing Bus Wiring
|
Details
|
 |
|
01-06-2021
|
1.00
|
Engine Crankshaft
|
Details
|
  |
|
01-05-2021
|
1.40
|
Fuse Bus and fuse locations
|
Details
|
|
|
01-04-2021
|
1.00
|
Wire Prep
|
Details
|
|
|
01-03-2021
|
4.50
|
Wire tie down panel & Contactor/current limiter mo
|
Details
|
|
|
01-02-2021
|
4.10
|
Install Voltage Regulators & Wire tie down panel
|
Details
|
|
|
01-01-2021
|
3.90
|
Fuse Bay Relay Mount (cont)
|
Details
|
|
|
12-31-2020
|
2.60
|
Fuse Bay Relay Board mount (cont)
|
Details
|
|
|
12-30-2020
|
3.90
|
Fuse Bay - design and fab relay board mount
|
Details
|
|
|
12-29-2020
|
1.50
|
Fuse Bay Gap Fillers
|
Details
|
|
|
12-28-2020
|
1.00
|
Provide information for Avionics Harness
|
Details
|
|
|
12-27-2020
|
2.10
|
Instrument Panel Labels
|
Details
|
 |
|
12-26-2020
|
2.50
|
Right side switch panel
|
Details
|
 |
|
12-24-2020
|
1.50
|
Circuit Breaker Panel Labels
|
Details
|
 |
|
12-22-2020
|
2.00
|
Flight Data Systems wiring
|
Details
|
 |
|
12-20-2020
|
1.00
|
Work with wire labels
|
Details
|
  |
|
12-03-2020
|
0.00
|
Cutting Jim's instrument panel
|
Details
|
|
|
11-20-2020
|
0.00
|
Start on Jim's Instrument Panel
|
Details
|
|
|
11-15-2020
|
2.80
|
Assemble Electrical Bay Cover
|
Details
|
|
|
11-12-2020
|
0.00
|
House Flooring Project
|
Details
|
|
|
11-10-2020
|
4.50
|
Paint Panels
|
Details
|
 |
|
11-09-2020
|
2.70
|
Smoke on light and more panel prep
|
Details
|
|
|
11-08-2020
|
1.20
|
More Panel Paint Prep
|
Details
|
 |
|
11-05-2020
|
0.70
|
Sand panels
|
Details
|
  |
|
11-04-2020
|
2.50
|
Rear Throttle Quadrant #7
|
Details
|
|
|
11-03-2020
|
1.00
|
Rear Throttle Quadrant #6
|
Details
|
 |
|
11-02-2020
|
1.00
|
Rear Throttle Quadrant #5
|
Details
|
 |
|
11-01-2020
|
3.30
|
Rear Throttle Quadrant #4
|
Details
|
|
|
10-31-2020
|
0.00
|
Flight to SFZ to pick up my brother Rons urn #2
|
Details
|
|
|
10-31-2020
|
0.00
|
Flight to SFZ to pick up my brother Rons urn
|
Details
|
|
|
10-30-2020
|
0.90
|
Rear Throttle Quadrant #3
|
Details
|
 |
|
10-29-2020
|
2.20
|
Rear Throttle Quadrant #2
|
Details
|
 |
|
10-28-2020
|
2.10
|
Rear throttle quadrant & modify rheostats
|
Details
|
|
|
10-27-2020
|
2.60
|
Modify Console Angle Panel
|
Details
|
|
|
10-26-2020
|
2.60
|
Right Console Angle Panel
|
Details
|
|
|
10-25-2020
|
5.60
|
Cut switch holes in panels
|
Details
|
|
|
10-24-2020
|
3.10
|
Subpanel and Angle Panel Switch layout
|
Details
|
|
|
10-23-2020
|
2.40
|
Cut clearance in subpanels
|
Details
|
|
|
10-22-2020
|
1.70
|
Locate clearance for switches in subpanels
|
Details
|
|
|
10-21-2020
|
2.00
|
Work on switches
|
Details
|
|
|
10-20-2020
|
1.90
|
Completed Rheostat Brackets
|
Details
|
|
|
10-19-2020
|
3.40
|
Rheostat Mount Brackets (cont)
|
Details
|
|
|
10-18-2020
|
1.50
|
Rheostat Mount
|
Details
|
 |
|
10-17-2020
|
8.10
|
Attach Brackets to Panel - Backup Battery Bracket
|
Details
|
|
|
10-14-2020
|
2.30
|
Complete GTN brackets and install
|
Details
|
|
|
10-13-2020
|
0.50
|
GEA 24 and GAD 29 holes
|
Details
|
 |
|
10-12-2020
|
4.90
|
GTX 45 brackets completed - GEA24 / GAD29 attachme
|
Details
|
|
|
10-11-2020
|
2.50
|
GTX 45 Brackets (cont)
|
Details
|
|
|
10-10-2020
|
4.90
|
GTX 45 Mounting Brackets
|
Details
|
|
|
10-09-2020
|
3.80
|
GTR20 Remote Comm Brackets
|
Details
|
|
|
10-08-2020
|
6.20
|
Complete GTN Rear Supports and Plan other Boxes
|
Details
|
|
|
10-07-2020
|
1.90
|
GTN 650 rear support brackets design
|
Details
|
 |
|
10-06-2020
|
2.20
|
Drill Tray Brackets to Panel
|
Details
|
 |
|
10-05-2020
|
1.40
|
Finish GTN 650 Brackets
|
Details
|
  |
|
10-04-2020
|
1.30
|
Remake GTN 650 brackets
|
Details
|
 |
|
10-03-2020
|
5.40
|
Insttument Panel debur and misc work
|
Details
|
|
|
10-02-2020
|
4.10
|
Cutting Left side of panel
|
Details
|
|
|
10-01-2020
|
2.50
|
Cutting Panel (cont)
|
Details
|
|
|
09-30-2020
|
1.30
|
Started cutting the "real" panel
|
Details
|
|
|
09-29-2020
|
2.10
|
Prep "real" panel for cutting
|
Details
|
|
|
09-28-2020
|
3.20
|
Disassemble Prototype Panel and Misc
|
Details
|
|
|
09-27-2020
|
3.10
|
Indicator lights and misc
|
Details
|
|
|
09-26-2020
|
9.30
|
Finish designing and making brackets
|
Details
|
|
|
09-25-2020
|
2.30
|
Install boxes and design brackets
|
Details
|
|
|
09-24-2020
|
4.10
|
Cut reliefs in panel frame
|
Details
|
|
|
09-23-2020
|
2.40
|
Prototype Panel - cutting switch and light holes
|
Details
|
|
|
09-22-2020
|
2.90
|
Prototype Panel - continue cutting left side
|
Details
|
|
|
09-21-2020
|
2.40
|
Prototype panel - continue cutting
|
Details
|
|
|
09-20-2020
|
3.70
|
Setup and start cutting prototype panel
|
Details
|
 |
|
09-19-2020
|
2.60
|
Panel Layout - Dimensions & Blueprint (cont)
|
Details
|
|
|
09-18-2020
|
3.70
|
Panel Layout - Dimensions & Blueprint
|
Details
|
|
|
09-17-2020
|
2.10
|
Panel work switches and lights
|
Details
|
|
|
09-16-2020
|
2.00
|
Prototype Panel Layout
|
Details
|
 |
|
09- |