KitLog pro

Powered By Kitlog Pro v2.0

Bob's RV-8 Build Site
' style=
Date:  1-3-2023
Number of Hours:  2.10
Manual Reference:  
Brief Description:  Baffle Ignition Wire Pass-thru's

Finalized the major holes for ducting and pass thru's for ignition wires. I measured and formulated what I had to have for clearance on the ignition wire pass thru and then went to cutting the necessary holes on the right rear baffle and then the left rear baffle.

I will probably attach the pass thru's using nutplates and will drill and countersink for them but will wait until after coating to install them.
' style=

Right Side Pass thru

Right Side Pass thru

' style=

Left Side Pass thru

Left Side Pass thru

' style=

Clearance hole and attach holes

Clearance hole and attach holes

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.