KitLog pro

Powered By Kitlog Pro v2.0

Bob's RV-8 Build Site
' style=
Date:  2-11-2024
Number of Hours:  1.10
Manual Reference:  
Brief Description:  Fiberglass and Tank Brackets

My wife and I were gone most of the day but I was able to get in the shop for a bit.

I removed the dams on the wheel pant and the oil door opening where I added more material to get the edges better. Working with Rick has really increased my ability to figure out fiberglass....but my abilities are at merely an apprentice level to OB Rick Kenobe Fiberglass Jedi. Things are coming along. I spent a little time sanding the area....it needs a little more filler and sanding.

I decided to go out to the shop and get the aluminum channel cut and blanked out for when I cut the Fuel Tank Brackets they are ready to go.
' style=

Oil door getting closer to completion

Oil door getting closer to completion

' style=

Trimmed Fuel Tank Bracket material

Trimmed Fuel Tank Bracket material

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.