With having to head out for work on Sunday I had a lot of stuff to do prior to leaving.
I did get down to the basement and got one side of the skirt sanded and the second side partially sanded before I was called away. The thin .75 oz fiberglass seems to be doing a great job on covering the rivet heads.....the first step to getting the skirt finished up.