I connected the clear and red pitot and static lines to the AOA module and ran the tubes towards the area where they will join the connections behind with the ADHRS modules.
I did more lacing and tying of wires and tubes where I saw needed.
We had put some wires throught the left and right firewall pass throughs and had cut fire sleeves for each so I felt that I needed to slide the sleeves on before they were overlooked and everything wired before noticing the sleeves were missing. Both the clamps and sleeves are ready.