Brief Description: Park Brake and Alt Air Cable Mod #3
Today I began working on the forward bracket for the cables. Once again it took a lot of measuring and planning. I already had a hole in the tower that I wanted to reuse in the new bracket so I had to measure where to put the bracket in order to have the two cable rods pass through the forward holes. It was a darn lot of measuring and drawing it out. There is a lot more to the process than you may think especially when you have to have two cables line up in two separate brackets to make it all work.
I was able to draw up a sketch and when it appreared that it should work I went into the shop and started to make the bracket. By the end of the day I had the forward bracket complete. The holes on the forward bracket will use snap bushings to retain the cable rods. I still have to work on the backing plate that will go in the gear tower.