Finally got the routing of the conduit and battery cable figured out. Used step drill to cut some holes in the gear tower. Pulled (pushed, whatever) the corrugated conduit into the gear tower. I’m waiting on some snap bushings and clamps to secure the battery cable. I did receive some tubing from ACS, so I made up the fuel line from the pump to the firewall. The hole in the firewall where the fuel line penetrates with a bulkhead fitting just happens to be underneath one of the arms on the rotisserie. So, before making up this line, I had to re-install the false spars, set them on jackstands, then partially disassemble the rotisserie.