Dimpled inspection panels and corresponding holes on right wing skin for #8 screws. Decided 5 days was long enough for testing of the right tank. Water level moved up and down-just like the temp in the shop. Nancy and I moved the wing back onto the table—need to finish installing landing light bracket.-