KitLog pro

Powered By Kitlog Pro v2.0

Steve & Nancy Riffe
' style=
Date:  12-17-2010
Number of Hours:  1.20
Manual Reference:  
Brief Description:  Drilling W-816 tubes to VA-111's

Finished fitting and match drilling the 3 remaining W-816 tubes and the VA-111 pieces. As usual, the next 3 went a lot faster than the one that I did last night. I’m not totally satisfied with the primer inside the tubes. Very hard to tell if everything is really covered or not. I used a rattle can to spray primer in the tube until it was dripping from the other end, but still not certain of the coverage. Before I rivet on the VA-111’s, think I will get a can of primer and pour it in the tubes.
' style=

Finished match drilling W-816 tubes

Finished match drilling W-816 tubes

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.