KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  11-26-2009
Number of Hours:  0.50
Manual Reference:  
Brief Description:  Forward Covers 1 Laying out Parts

Took me a whole Saturday of messing around to make the rotisserie. Now I get to assemble and airplane part. Per plans I'm assembling the forward covers.

I have a lot of forward covers because some of these are extra to cover the fuel injected fuel pump that will eventually come from AndAir. I did return the Van's fuel selector valve and had them send me the Andair selector.

First is the heat baffle to center cabin cover.

Then the plans say to install this in the forward fuselage. As soon as you do you open a can of worms, because all the covers need to be installed with clecoes to ensure proper location of everything.
' style=

Forward covers

Forward covers

' style=

Andair fuel selector valve

Andair fuel selector valve

' style=

Heat Baffle and Center Cabin Cover

Heat Baffle and Center Cabin Cover

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.