KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  10-2-2010
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Redo Fuel Lines 3: Installed firewall doubler

I pounded the rivets and installed the AN819-6 fitting. But this is a steel fitting. I've ordered an aluminum instead. I thought steel might be better for in the engine compartment, but it is too heavy.
Also I painted the doubler with high temperature engine paint.

So now I have an end point for the fuel line. Next I'll order fuel lines from Bonaco.
' style=

Doubler riveted on

Doubler riveted on

' style=

AN fitting installed

AN fitting installed

' style=

End point for fuel line

End point for fuel line

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.