KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  4-2-2010
Number of Hours:  0.20
Manual Reference:  
Brief Description:  Fuselage Final Items: Air inlet scoops 2

In addition to using Proseal to glue these on, I'm putting 6 rivets in each one. I clamped them in place and drilled the holes. Then I dimpled the holes #40. I plan to use flush #40 pulled rivets.

With light shinning thru you can see the flange overlap.

I used the pop rivet dimpler.
' style=

Clamped to drill

Clamped to drill

' style=

Clamped for drilling

Clamped for drilling

' style=

Dimpling

Dimpling

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.