KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  4-2-2010
Number of Hours:  0.20
Manual Reference:  
Brief Description:  Fuselage Final Items: Air inlet scoops 3

Next I made a bunch of little square washers for the back of the air inlet for the rivets to hold. I made a strip and used my accordian drilling guide to drill a bunch of holes. Then I cut the pieces to length.

I tested using solid rivets but the solid rivet expanded on the inside of the plastic and pushed the two sheets of aluminum apart. So I will use the pulled rivets.
' style=

Making rivet washers

Making rivet washers

' style=

A dozen square rivet washers

A dozen square rivet washers

' style=

Solid rivet expanded (no good)

Solid rivet expanded (no good)

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.