KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  2-22-2010
Number of Hours:  0.50
Manual Reference:  
Brief Description:  Cabin Frame Roll Bar 38: Prime channel parts

The aft end of the overhead channel has a spacer that rivets to it and the aft skin and bulkhead. Seems like it should be riveted to the channel now, although this is not mentioned in the plan. Then later when the skin is riveted on this will get installed at that time.

I primed all these parts and will paint them the light hammered grew interior color I'm using.

I'll prime the roll bar after I fill in the holes with some fiberglass putty. I've order some.
' style=

Cover is done for the overhead channel

Cover is done for the overhead channel

' style=

Riveted spacer to channel

Riveted spacer to channel

' style=

Primed the parts.

Primed the parts.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.