KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  2-18-2010
Number of Hours:  0.20
Manual Reference:  
Brief Description:  Cabin Frame Roll Bar 27: Overhead Channel

I used the long bit to drill the holes.

The forward end of this channel gets drilled to the 4 inch angle. And the two short angles get drilled on either side now two. These short angles are the ones I'll rivet the the roll bar frame and then finish riveting the frame.
' style=

Drill aft end of channel

Drill aft end of channel

' style=

Drilled to bulkhead

Drilled to bulkhead

' style=

Drill forward end of channel

Drill forward end of channel

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.