KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  5-2-2009
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Longerons - Drill Canopy Deck

I found some .032 aluminum strip and clamped it to the outside of the longerons. It represents the skin that will eventually be on here. Then I positioned the canopy deck at the 24 1/4 location and overlaping the .032 skin. I clamped it and drilled it. I clecoed as I went. I ended up with flush and slight overhang along the length. I think it is okay. If the slight overhang bugs me later I'll sand it off.
' style=

Clamp on strip of scrape

Clamp on strip of scrape

' style=

Position and clamp in place

Position and clamp in place

' style=

Drill cleco as you go.

Drill cleco as you go.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.