|
|
RV-7A Construction Log
|
Date: 12-10-2008
|
Number of Hours: 1.00
|
Manual Reference:
|
Brief Description: Tank Assy - Baffle RightTank 1
|
|
Finally, I closed the right tank. I got a weird ear infection, or something right after closing the left tank and now I think it might have been an allergic reaction to the MEK. Yikes. Tonight I put the baffle and z-brackets on the right tank. It only took 4 hours, which is down from 5.5 hours that it took for the left tank. Same process, just not so many backups and restarts.
|
|
Tank, Baffle, Z-brackets, clean,etched, ready
|
|
Workstation and tools. CHECK
|
|
Inside of bay 1, 2 Right Tank
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |