Brief Description: Tank Assy - 10 Internal Ribs Done
I finished the 10 internal ribs in the two tanks. Now I gotta re-read what to do next. 1) Prep Inboard Rib 2) Install Capacitance Unit 3) Install Fuel Vent Line 4) Install Fuel Return Line 5) Rivet on inboard Rib 6) Prepare and Rivet Outbd rib 7) Install flop tubes and doublers to outside ribs