KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
< Previous Log Entry          Next Log Entry >
' style=
Date:  4-7-2008
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Bought the Empennage

I went to Vans today with my brother Ed, who is building an RV-7A and with my buddy Bob who is going to. Bruce piloted the RV-6A ship number 1, the blue beauty with me for a test ride. Very fun. I felt it, when Bruce did a 90 Degree banked turn. We couldn't do aerobatics, but he showed me the roll rate. The airplane was very response, requiring only light control inputs. I can hardly wait to fly mine, but I'm in no hurry. Building will be as fun as flying. I got my official customer / seriel number today. We just put all the parts in the back of my car. I think I could have carried them home in my Cherokee. I spent some time going through the parts and sorting them by "E" Elevator, "HS" Horizontal Stablizer, "R" Rudder, "VS" Vertical Stabilizer. It was good mental preparation to see, touch all the parts and part numbers. I'll start next weekend.
' style=

Emennage Kit

Emennage Kit

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.