Powered By Kitlog Pro v2.0
RV-7A Construction Log
RV-7A
All
4-19-2010
< Previous Log Entry
Next Log Entry >
Date:
4-19-2010
Number of Hours:
0.30
Manual Reference:
Brief Description:
Canopy Install: Canopy Release 5
Next the release hinge block gets drilled to the sub-panel and platenuts installed.
I clamped the block in position and drilled the two #12 holes.
Then to locate platenuts, I put a #8 screw thru the platenut backwards, and clecoed it in place for drilling the rivet holes.
Then to rivet it, I bolted the platenut in place and used flush platenut rivets which are pulled rivets.
Screw helps locate platenut
Drill rivet holes
Pulled rivets for platenuts
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
2101
1764
Avionics
60
53
Cert & Flying
62
75
Cowl
48
37
Electrical
61
48
Empennage
141
181
Engine
102
73
Finish Kit
255
148
Fuselage
339
238
Fuselage After Flip
385
237
Gear
78
57
Interior
16
14
Miscellaneous
49
33
Painting
62
50
Prop
17
17
Shop
5
10
Tools
59
24
Training Projects
12
32
Wings
350
437
Copyright © 2001-2024 Matronics. All Rights Reserved.