KitLog pro

Powered By Kitlog Pro v2.0

Project Blue Angels SeaRey
' style=
Date:  12-28-2012
Number of Hours:  4.00
Manual Reference:  5.11
Brief Description:  Section 5, making bulkhead cross tube cutout

This is one of the most nerve-racking parts. The manual calls for test-fitting the airframe, and using a straight-edge to draw lines where it should be cut. One thing I've heard other builders mention at this part, is the airframe with slide back a bit when going down into the new slot, requiring a larger cutout, and then fiberglass repair. What I did, I drew the lines, but then drew additional lines a bit more than 1/8" back, and cut there. It took about six test-fittings and removals of the airframe, but finally got it perfect, and no need to repair anything.
' style=

Lines drawn per spec, but actually cut a bit more towards the aft.

Lines drawn per spec, but actually cut a bit more towards the aft.

' style=




' style=

Bulkhead cross tube cutout complete.

Bulkhead cross tube cutout complete.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.