KitLog pro

Powered By Kitlog Pro v2.0

Sid & Houston Mayeux Project
' style=
Date:  7-1-2014
Number of Hours:  4.00
Manual Reference:  Baffles
Brief Description:  Number 4 baffle and oil cooler, part 2

I returned to the baffle construction, concentrating first on the #4 baffle and oil cooler. I riveted the platenuts to the aft wall front face with #3 solid flush rivets, then pop-riveted the square tube plenum walls with flush blind rivets. Everything fits flush. I continued assembling the #4 baffle assembly per the plans.

I had to install/remove the baffle to/from the engine several times to check and adjust the fit.
' style=

Checking the baffle/oil cooler fit

Checking the baffle/oil cooler fit

' style=

Plenum square tubes riveted to aft wall

Plenum square tubes riveted to aft wall

' style=

Plenum, cleco'd into shape

Plenum, cleco'd into shape

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.