KitLog pro

Powered By Kitlog Pro v2.0

Sid & Houston Mayeux Project
' style=
Date:  6-25-2014
Number of Hours:  3.00
Manual Reference:  Cowling
Brief Description:  Installing the cowling side camlocs

I got back to the cowling, after having already marked and drilled the rivet holes on June 18th. Today I countersank the rivet holes, then riveted the camloc flanges into place.

I then taped the metal flanges' front and back surfaces, sanded down the cowlings' inner surfaces with 80 grit sandpaper, and painted epoxy onto the inner surfaces. I did this to seal the fiberglass for future white paint.
' style=

Countersinking the rivet holes

Countersinking the rivet holes

' style=

Side camlocs in place

Side camlocs in place

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.