Powered By Kitlog Pro v2.0
James Roberts RV8 Build
RV8
All
2-4-2014
< Previous Log Entry
Next Log Entry >
Date:
2-4-2014
Number of Hours:
3.00
Manual Reference:
Brief Description:
Spar upgrades
Spent the evening at Bob's house to strip more of the rivets from the main spars and install the extrusion to the upper spar cap as part of the upgrades. Some poor underlying accuracy on the drilling of the original holes in the Zenith kit.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV8 Home
Category
# Logs
# Hours
All
132
582
Ailerons
4
10
Avionics
1
3
Canopy
21
94
Elevator
4
14
Empennage
13
42
Flight Controls
4
14
Forward Fuselage
41
168
Horizontal Stabilize
1
5
Inspection
1
1
Miscellaneous
8
15
Rear Fuselage
13
58
Shop Supplies
1
2
Undercarriage
4
52
Upgrade
10
96
Wings
6
8
Copyright © 2001-2024 Matronics. All Rights Reserved.