Powered By Kitlog Pro v2.0
Schroeders Sportsman
Sportsman 2+2
Wings
7-12-2009
< Previous Log Entry
Next Log Entry >
Date:
7-12-2009
Number of Hours:
1.20
Manual Reference:
p.193
Brief Description:
Fuel System
I started laying out the fuel system by running some string through the ribs and seeing the lay of the land. I started getting the line in place and got a start on it. I went bay by bay drilling and securing the fuel line on each rib.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Sportsman 2+2 Home
Category
# Logs
# Hours
All
1462
2855
Aileron
61
104
Avionics
66
102
Elevator
98
137
Engine
65
83
Final Assembly
292
735
Flap
39
86
Fuselage
314
584
Horizontal Stab
47
82
Horizontal Stab Elev
47
82
Miscellaneous
56
59
Parts
1
2
Rudder
24
55
Systems
87
134
Wings
265
610
Copyright © 2001-2024 Matronics. All Rights Reserved.