I pilot drilled the side and aft cage attach brackets to #30 then drilled them up to #10 for screws. I also go the countersinking done on almost all of the holes. I cut some bid cloth and finished up the belly seam layup. I also trimmed the forward cage attach brackets, drilled and riveted them.