Powered By Kitlog Pro v2.0
Schroeders Sportsman
Sportsman 2+2
All
7-30-2015
< Previous Log Entry
Next Log Entry >
Date:
7-30-2015
Number of Hours:
1.00
Manual Reference:
Brief Description:
EGT Sensors
I measured and cut the right forward additional cooling hole in the right baffle. I also measured and drilled the EGT sensors. I put all of them 2.5 inches below the exhaust manifold. I also drilled the right baffle airbox connection.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Sportsman 2+2 Home
Category
# Logs
# Hours
All
1462
2855
Aileron
61
104
Avionics
66
102
Elevator
98
137
Engine
65
83
Final Assembly
292
735
Flap
39
86
Fuselage
314
584
Horizontal Stab
47
82
Horizontal Stab Elev
47
82
Miscellaneous
56
59
Parts
1
2
Rudder
24
55
Systems
87
134
Wings
265
610
Copyright © 2001-2024 Matronics. All Rights Reserved.