KitLog pro

Powered By Kitlog Pro v2.0

Jims Web Site
' style=
Date:  2-7-2010
Number of Hours:  2.50
Manual Reference:  6ZU2
Brief Description:  Transferred hole for AN5 bolts to doublers

1. Checked diameter of 5/16" holes for tolerance; all OK
2. Used transfer punch to mark the 5/16" holes on the doublers.
3. Removed doublers.
4. Drilled punched holes with 1/4" bit.
5. Opened holes for snug fit with 5/16" bolt wih hand reamer.
6. Marked edges of doublers to match the edges of existing flanges, and trimmed.
7. Cut stress relief holes at corners.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.